
36 UDC 6300 Process Controller Product Manual 1/03
3.6 Tuning Parameters Set Up Group, Continued
Function prompts
(continued)
Table 3-3 Tuning Group Function Prompts, continued
Function Prompt
Lower Display
Function
Name
Selections or
Range of Setting
Upper Display
Factory
Setting
PVEU VAL5
PV5 Value for Gain
Scheduling
PV value within the PV limits.
In Engineering units
0
PVEU VAL6
PV6 Value for Gain
Scheduling
PV value within the PV limits.
In Engineering units
0
PVEU VAL7
PV7 Value for Gain
Scheduling
PV value within the PV limits.
In Engineering units
0
PVEU VAL8
PV8 Value for Gain
Scheduling
PV value within the PV limits.
In Engineering units
0
GAIN VAL1 *
Gain 1 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
GAIN VAL2 *
Gain 2 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
GAIN VAL3 *
Gain 3 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
GAIN VAL4 *
Gain 4 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
GAIN VAL5 *
Gain 5 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
GAIN VAL6 *
Gain 6 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
GAIN VAL7 *
Gain 7 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
GAIN VAL8 *
Gain 8 Value for Gain
Scheduling
0.001 to 1000
Gain or PB
1.0
*
ATTENTION
If units of percent proportional band (PB) are selected under Set Up prompt "CONTROL", function
prompt "PB or GAIN, these values displayed are in %PB, but the lower display will still show Gain.
Komentarze do niniejszej Instrukcji